Skip to content
Lighting Partners of Central Florida
Your Lighting Resource
Lighting Partners of Central FloridaLighting Partners of Central Florida
  • Line Card
    • Manufacturer Search
    • Product Search
    • Product Samples
    • Project Starter
  • Education
    • Product Presentations
    • AIA Approved Courses
    • Industry News
    • Events
  • Gallery
  • Contact Us
Linkedin page opens in new windowInstagram page opens in new window
  • Line Card
    • Manufacturer Search
    • Product Search
    • Product Samples
    • Project Starter
  • Education
    • Product Presentations
    • AIA Approved Courses
    • Industry News
    • Events
  • Gallery
  • Contact Us

Start-Up Request Form

Step 1 of 5

20%
MM slash DD slash YYYY
Address
MM slash DD slash YYYY
General
  1. All panels, room controllers, switches, occupancy sensors, photocells, and other peripheral devices have been terminated and are powered.
  2. All RJ-45 CAT5/5E cables have been terminated and properly tested.
  3. All as-built documentation is complete, accurate and submitted to Lighting Partners at least 2 weeks prior to the commissioning start-up date.
    The as-built information must include the following.
    • Panel/Room load schedules
    • Switch schedules
    • Occupancy sensor settings. Auto On/Off, Vacancy Only and time out
    • Daylight harvesting information
    • Time clock schedules
    • Any programming information that may be required for a fully functioning system.
  4. An electrician familiar with the installation of the lighting control system, must be available with ladders or anything else for access to the system components.
  5. Ensure that end user representatives are to be onsite for orientation and training on the system.
Daylighting Systems
  1. All daylighting sensors have been installed and fully operable.
  2. The daylighting control areas are completed and ready for occupancy.
Dimming Systems
  1. All dimming controllers have been terminated and are powered.
  2. All lighting fixtures have been installed and 0-10V dimming wires have been installed and verified.
Have questions?? Give us a call (407) 852-7171
Please confirm all of the following tasks are complete:(Required)
Start-up and training have been coordinated with the following parties:(Required)
Will training happen during the visit.(Required)
MM slash DD slash YYYY
Requested Training Time
:

NOTE: An additional charge may apply if training is not scheduled during the time of the start-up.

Is there anything else we should know?

Please read & sign

If the items are not completed, as verified above, on the arrival of the Field Engineer, then the Field Engineer will leave the job site and the contractor or distributor will be charged the full cost of the scheduled visit. Another visit will need to be rescheduled with Lighting Partners at the contractor/distributor’s expense once all the above items have been completed.
Clear Signature
Lighting Partners of Central Florida logo
Office
4063 N. Goldenrod Road Suite 200
Winter Park, FL 32792

407-852-7171
Contact
quotes@lightingpartnerscf.com
orders@lightingpartnerscf.com
Social

Find us on:

Linkedin page opens in new windowInstagram page opens in new window
Copyright © 2025 Lighting Partners of Central Florida

Powered by Your Lighting Brand

Go to Top